The Bridge will be open for May Bank Holiday, Monday 2 May from 10am until 4pm. Last entry to the top is at 3.15pm, and last gondola ride is at 3.50pm. A new beer has been produced to celebrate the bridge’s designer and it will be available to buy. Follow the link for details and to book a ticket